  • Nadarivatu Plant Gate Monitoring System in Figi

    Gate and Auxiliary Monitoring System conducts real-time monitoring, control, statistics and protection of the oil, water, gas ect. auxiliary systems and realizes their interaction with other systems of hydropower stations. It creates foundation for...

  • Renewable Energy

    NES5420 pitch system is suitable for special environment of wind power equipment. The compact design will reduce the centrifugal force produced during rotation along with the hub. Accurate positioning control and quick adjustment of pitch angle can...

  • Saudi Arabia combustion engine

    Early April 2010, with Saudi Arabia Faras power plant unit no. 10 interconnection test is completed, its electricity/nanjing research institute south group company's ranks rui technology co., LTD., successfully completed the Saudi electricity...

  • Domestic renewable energy projects

    NARI converter technology is in the leading position in the domestic market. The company is also investing big in technology research for China power grid including grid adaptability research and converter future versions research. It Provide the...

  • Jinan 110kV mobile intelligent substation

    The Jinan 110kV mobile intelligent substation includes 110kVPASS switch vehicle, 25MVA main transformer vehicle, 10kV middle-voltage switch and low-voltage control panel cabinet vehicle and primary high-voltage cable.

  • Domestic renewable energy projects

    NES5430 main control system for wind turbine has passed the field on-hook test of the Ningxia Yinxin Energy 1MW variable pitch wind turbine with asynchronous generator, and so far there has been a mass supply of the system for 194 wind turbines.

  • Ningxia Datang International Wind farm dam

    Ningxia Datang International Qingtongxia 48 MW wind power project in Ningxia Qingtongxia Dam power plant two kilometers west pier sand hills. The wind farm plans to install 24 single capacity of 2,000 kilowatts of wind turbines, which is provided by...

  • Udan Open 3000 EMS system

    Contracted in October 2008, National Load Dispatching Center (NLDC) modification project in Sudan National Load Dispatching Center delivered an integrated SCADA/EMS system, which was NARI’s first SCADA/EMS system exported to international...